{"product_id":"30ft-check-cord-dog-training-leash-long-lead-for-recall-tracking-obedience","title":"Long Dog Training Leash, Orange, 50 Ft","description":"\u003cp\u003ePractice recall and supervised distance work with a long rope training lead.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003eSelected option is Orange, 50 ft long and 3\/8 in (9.5 mm) in diameter.\u003c\/li\u003e\n\u003cli\u003eLightweight non-absorbent rope with a double-layer padded woven handle.\u003c\/li\u003e\n\u003cli\u003e360-degree swivel hook helps reduce twisting.\u003c\/li\u003e\n\u003cli\u003eIncludes a carry backpack; rope is described as floating in water.\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Fuzzy Furry Oasis","offers":[{"title":"Orange \/ 3\/8 Inch * 50Foot","offer_id":67875261415594,"sku":"c6fc2817-caf4-4579-ab3a-a2cc28a9b2e0","price":55.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0720\/4500\/2922\/files\/1f3eb41f28bf13e011b844da0726035d.jpg?v=1794232750","url":"https:\/\/fuzzyfurryoasis.com\/products\/30ft-check-cord-dog-training-leash-long-lead-for-recall-tracking-obedience","provider":"Fuzzy Furry Oasis","version":"1.0","type":"link"}